Western Harbour Redevelopment, Leith, Edinburgh

As part of the waterfront regeneration of Leith, our clients Forth Property Developments Ltd are
developing the harbour for the construction of over 2000 residential properties and 40,000m2
of commercial & retail development.
As primary consultant, we have been involved in the infrastructure design, reclamation, environmental
and site investigations, dredging, quay wall construction & supervision of infilling contractors.

  • Site Investigations
    Coordination of all site investigation and reports on ground conditions and flooding.

  • Dredging
    Coordination and implementation of all dredging works and silt removal and testing and using
    our 3D models to calculate volumes of any infill required.

  • Land Reclamation
    Design & supervision of all land reclamation including material screening, SEPA/Local Authority
    certification, land forming, ground stabilisation implementation & monitoring and forecasting.

  • Environmental
    Coordination and reports on soil testing and the suitability in accordance with current
    environmental legislation. Full consultation with all relevant authorities.

  • Geotechnical
    Reports on Ground and soil testing and the suitability for construction.

  • Infrastructure design
    Design and supervision of Phase 1 spine road and main drainage infrastructure implementation.
    Management of existing and proposed utilities and site supervision for the site as a whole.

  • Harbour Structures
    Survey, report and design solutions for the integrity of all existing and proposed marine
    structures including breakwater and quay walls.

  • Topography
    Coordination and implementation of all topographical and bathymetrical surveys. Our 3D modelling
    capabilities allow us to report to the clients on the progress, volumetric costings and forecasts.