Granton Harbour Redevelopment, Edinburgh
As part of the waterfront regeneration of Leith, our clients Forth Property Developments Ltd are developing the harbour for the construction of over 3500
residential properties and 13,000m2 of commercial & retail development.
We have been involved in the land forming earthworks, reclamation, environmental & site investigations, dredging,
quay wall construction & general coordination and supervision on behalf of our clients.
Site Investigations Coordination of all site investigation and reports on ground conditions and flooding.
Dredging Coordination and implementation of all dredging works and silt removal and testing and using our 3D models to calculate volumes of any infill required.
Land Reclamation Design & supervision of all land reclamation including material screening, SEPA/Local Authority
certification, land forming, ground stabilisation implementation & monitoring and forecasting.
Earthworks Preparation and monitoring of land forming earthworks.
Environmental Coordination and reports on soil testing and the suitability in accordance with current environmental legislation. Full consultation with all relevant authorities.
Geotechnical Reports on Ground and soil testing and the suitability for construction.
Harbour Structures Survey, report and design solutions for the integrity of all existing and proposed marine structures including breakwater and quay walls.
Pier Feasibility Survey inspection and report on the structural integrity of existing pier
Topography Coordination and implementation of all topographical and bathymetrical surveys. Our 3D modelling capabilities allow us to report to the clients on the
progress, volumetric costings and forecasts.
  
Copyright
© 2005 Buchanan Laird Ltd
|